DN125 R190.5 90° Model E
Concrete boom pump wear resistant bend pipe performance comprehensive description | ||||||||||
Name | Specification | Material | Weight(kg) | Manufacture process | Dimmension and degree tolerance | Pressure | Flange section | Surface coating | ||
Boom wear resistant bend pipe Model E | DN125 R190.5 90° | ZGMn13-4 | 12.5 | Precision Casting | <1mm <1° | 160bar | Precision Machining | Epoxy Resin Paint |
Lifetime:(Conventional working environment;The average data from the survey of 50 customers in 5 countries): 590 Working hours
Application:Specially applied for SANY/ZOOM/KYOKUTO concrete boom pump
Acceuil|Sur nous|Produits|Cas des travaux| Nouvelles|Contactez-nous|Géographie du site
Tel.: +86-311-83076206 Fax:+86-311-83076206E-mail: rh@runhgk.com / tuig@runhgk.com
Copyright © 2014 Hebei Runhong Construction Machinery Manufacture(Pipeline)Co.,Ltd.